The jetty and conveyor at the port of Bargny-Sendou
PROJECTS

Our projects and completed works

From the port of Bargny-Sendou to the port of Dakar and the Abidjan lagoon: our projects in preparation and in progress, and what our teams have already delivered.

IN PREPARATION

Project in preparation

SECOWA’s next major marine structure at the port of Bargny-Sendou.

IN PREPARATION · MARINE WORKS

2 km jetty on 434 piles

An access jetty to the future mineral quay, built on steel piles: pile driving at sea, deck and fittings.

LENGTH2,000 mFOUNDATIONS434 steel pilesREBAR6,000 tCONCRETE33,000 m³PURPOSEAccess to the future mineral quaySTATUSIn preparation
IN PROGRESS

Project in progress

Our teams are currently engaged in the fabrication and erection of the access trestle.

IN PROGRESS · STEEL CONSTRUCTION

360 m access trestle

Fabrication and erection of a 360 m access trestle: a walkway of truss spans on steel piles, linking the dry quay to the liquid-bulk quay and supporting the pipelines.

LENGTH360 mSTRUCTURETruss spans and steel pilesPURPOSEPipeline support between the dry quay and the liquid-bulk quaySTATUSIn progress
Steel construction photos
Access trestle truss spans Access trestle piles, packed for shipment Truss spans ready for erection Night lift of a truss span