PROJECT IN PREPARATION
STRUCTUREMineral access jetty LENGTH2,000 m FOUNDATIONS434 piles REBAR6,000 t CONCRETE33,000 m³ SITEBargny-Sendou, Senegal
200
piles protected
600m
of crane rails laid
2,000m
of conveyors erected
2
Siwertell unloaders erected
360m
of access trestle fabricated
6,000m³
of concrete poured
OUR TRADES

Five areas of expertise, from sea to plant

Select a trade to see our projects. All photos were taken on site by our teams.

Installing anodes on the jetty piles
Installing anodes on the jetty piles

Pile protection, cathodic protection, breakwaters and bathymetric surveys: SECOWA works both at sea and on the quay.

Pile protection Rock armour and coastal protection works Bathymetric survey on the Abidjan lagoon (quay at Vridi)
All “Marine works” photos

Vibratory pile driving and pile driving for port and industrial structures, on land and at sea from a jack-up.

Pile driving on a seafront site Onshore pile driving, crawler crane Pile ready for driving
All “Deep foundations” photos

Conveyor and silo building foundations, excavation, reinforcement, formwork and concrete footings: SECOWA carries out the civil engineering works associated with its steel structures, as well as offsite works.

Conveyor civil works: reinforcement and formwork Seafront conveyor footings Pumped concrete placement beside a storage tank
All “Civil engineering” photos

Conveyor structures, silo buildings, steel frames and access trestle: from fabrication to erection, SECOWA builds tall steel structures on industrial and port sites.

Access trestle truss spans Conveyor erection on the jetty Silo steelwork during erection
All “Steel construction” photos

Erection of Siwertell unloaders, installation of crane rails and conveyors, in port and mining settings.

Erection in progress Siwertell unloader erected Laying the crane rails
All “Industrial works” photos
IN ACTION

From erection to load testing

On the quay at Bargny-Sendou, our teams erected the two Siwertell unloaders: laying the crane rails, assembling the structure and lifting the booms, through to load testing.

OUR AMBITION

To become the first Senegalese company able to carry out 100% of marine works, through local expertise and advanced technology.

Quality

Work carried out to industry standards and inspected at every stage.

Schedule

Schedules met, with teams and equipment sized to the project.

Safety

Two QHSE engineers and teams trained for the demands of offshore work.

Environment

Compliance with environmental standards, at sea and on land.

OUR RESOURCES

Our own teams and equipment

From the jack-up barge to the welding station, SECOWA deploys its own resources on every project.

Siwertell unloader and lifting equipment on the quay

Equipment

  • 400 t jack-up barge (30 m × 24 m)
  • 200 t crane
  • Vibratory hammer, 600 kN extraction force
  • Hydraulic hammer, 306 kNm impact energy
  • 2 generators
  • Bending machine for rebar shaping
  • 5 self-contained welding units and 4 welding stations
  • Manitou, forks, aerial work platform, truck-mounted crane
  • Containers (offices and storage)
  • Compressors, winches with hydraulic power pack

Personnel

  • 1 project director
  • 2 works directors
  • 2 site managers
  • 1 administrative and finance manager
  • 3 site supervisors, 4 team leaders
  • 2 QHSE engineers
  • Survey team, 2 crane operators
  • Welders, pile-driving crews, riggers-erectors
  • Formwork carpenters, steel fixers, masons
  • Mechanic and labourers
Weekly safety toolbox talk for the SECOWA team, at the foot of a Siwertell unloader
Weekly safety toolbox talk on the quay at Bargny-Sendou
HEALTH, SAFETY AND ENVIRONMENT

Safety first, on land and at sea

days without an accidentSince 8 April 2025 · the counter updates daily

Dedicated QHSE supervision

Two QHSE engineers support our teams and monitor safety, quality and the environment on every project.

A safety toolbox talk every week

Teams meet for fifteen minutes to review site risks, instructions and points requiring attention.

Mandatory protective equipment

Helmet, safety shoes and high-visibility vest; harness for work at height, life jacket for work at sea.

Respect for the sea and the environment

We work on the ocean’s edge: clean, tidy sites and constant care for the marine environment.

Part of the Siwertell unloader erection team
Part of the crane erection team, Bargny-Sendou quay
ABOUT US

A Senegalese construction company

SECOWA SA is a company incorporated under Senegalese law, based at the port of Bargny-Sendou.

Founded by three engineers, its philosophy is to deliver quality work on schedule, in compliance with safety requirements and environmental standards.

The team in pictures
THEY TRUST US

Our clients

Project owners and main contractors
SMP — Senegal Minergy Port
ELTON
Bruks Siwertell
TAKRAF
ETERMAR
Boluda
Damen Shiprepair
PETROCI
Power32 — Methanol as Power
Leduc
SIFI

Our partners

Engineering, inspection, insurance and suppliers
Oceaning, engenheiros consultoresOUR DESIGN OFFICE
Safier Ingénierie SAS
CA3C — Cabinet d’assistance et de contrôle des constructions complexes
Allianz
Gnee Steel
Shanghai Matsuo Steel Structure
Yongan Machinery
GEDES International
LBTP — S.A.P.F.P.M.
All Service Africa
FROM IDEA TO SITE

A structure to build, at sea or on land?

  1. 01You describe your project: type, location, schedule.
  2. 02An engineer replies within 48 working hours to clarify your requirements.
  3. 03We design and price the right technical solution.
TALK TO AN ENGINEER +221 77 644 44 40 info@secowa.sn Mon–Fri 8 am–6 pm · Sat 8 am–3 pm Describe my project